Work Item
ASTM WK89728

Withdrawal of F2984-13(2019) Standard Specification for Segmental Panel System for the Grout-in-Place-Liner (GIPL) Rehabilitation Method of Existing Man-Entry Size Sewers, Culverts, and Conduits

Rationale

This standard is being balloted for withdrawal with no replacement because It is the F17.67 Subcommittee’s belief that products manufactured to this specification are not currently in use within the marketplace. If this is in fact the case, then we would anticipate a successful ballot for withdrawal. If we are incorrect in this presumption, then upon completion of the balloting process we would hope to have identified person(s) capable of assisting with a full technical review.

Details

Developed by Subcommittee: F17.67

Committee: F17

Staff Manager: Kevin Shanahan

Work Item Status

Date Initiated: 02-20-2024

Technical Contact: Steven Ferry