This work item is to perform a deeper dive into various aspects to improve repeatability and reliability of the D2070 method (referred to as Phase 2) after the initial revision of D2070 to address anything egregious (referred to as Phase 1 - WK82538). The proposed possible method update topics for Phase 2 may include, but not be limited to, filter processing, re-use of rods, EOT rod analysis, test temperature monitoring, additional calculations from the original Fives/CM method, and how to address the CM'B procedure.
Date Initiated: 06-28-2023
Technical Contact: Joshua Earley