WK68890 Standard Practice for Rehabilitation of Existing Building Drain, Waste and Vent Piping Using a Cured-In-Place Pipe (CIPP) Lining System
WK91258 Polyester Reinforced Flexible Reinforced Plastic Hoses (FRPH) for Close Fit Interactive Pressure Pipe Rehabilitation
WK85872 The order of operations for installation of sewer system clean-outs, lining of sewer mains and laterals, and containing and filtering emissions resulting from the curing of the resin-impregnated liners
WK81129 Installation of Aramid Fiber Reinforced FFRP for the Rehabilitation of Pressure Pipelines
WK81128 Flexible Fabric Reinforced (FFRP) Connectors for Pressure Pipeline Rehabilitation