Subcommittee C13.05 on Special Projects


    Showing results 1-8 of 8 matching ACTIVE standards under the jurisdiction of C13.05     C13 Home

    C1131-20 Standard Practice for Least Cost (Life Cycle) Analysis of Concrete Culvert, Storm Sewer, and Sanitary Sewer Systems

        See also WK70397 proposed revision

        See also WK74465 proposed revision

    C1417-19 Standard Specification for Manufacture of Reinforced Concrete Sewer, Storm Drain, and Culvert Pipe for Direct Design

    C1417M-19 Standard Specification for Manufacture of Reinforced Concrete Sewer, Storm Drain, and Culvert Pipe for Direct Design (Metric)

    C1479-16(2021) Standard Practice for Installation of Precast Concrete Sewer, Storm Drain, and Culvert Pipe Using Standard Installations

        See also WK76693 proposed revision

    C1479M-16(2021) Standard Practice for Installation of Precast Concrete Sewer, Storm Drain, and Culvert Pipe Using Standard Installations (Metric)

    C1675-21 Standard Practice for Installation of Precast Reinforced Concrete Monolithic Box Sections for Culverts, Storm Drains, and Sewers

        See also WK74134 proposed revision

    C1837-17 Standard Specification for Production of Dry Cast Concrete Used for Manufacturing Pipe, Box, and Precast Structures

    C1840/C1840M-17 Standard Practice for Inspection and Acceptance of Installed Reinforced Concrete Culvert, Storm Drain, and Storm Sewer Pipe

        See also WK76537 proposed revision

    0 matching Proposed New Standards under the jurisdiction of C13.05     C13 Home

    0 matching WITHDRAWN standards under the jurisdiction of C13.05     C13 Home