Revise section 14 Delivery Ticket Information to include the quantity of water that can be added at the job site. The quantity of water not added during batching or in transit should be communicated to the purchaser so that the quantity added at the job site does not exceed the mixing water content of the concrete mixture as designed for strength and other requirements.
Date Initiated: 05-19-2020
Technical Contact: David Germer
Item: 006
Ballot: C09.40 (21-03)
Status: Negative Votes Need Resolution