SYMPOSIA PAPER Published: 01 January 1991
STP17810S

Ingredients of a Third Generation Pavement Management System for the Ohio Department of Transportation

Source

The Pavement Management System described in this paper is the result of the development and implementation of a third generation pavement management system for the Ohio Department of Transportation which required slightly less than four years to complete. This is a network level system which provides optimal actions for candidate pavements, long range budget allocations, present assessment and future forecasting of the network conditions and rehabilitation need. Various modules and submodules are manipulated to achieve optimal solutions over a six year planning period by maximizing pavement performance for a given budget or minimizing cost for a given network performance level. The main components included in this system are: A pavement condition module; a maintenance and rehabilitation module; a cost module; a performance prediction module; an optimization module; and a report generation module. Additionally a scheme called “ project interference” is available in this PMS which can be specified as a constraint to the optimal solution whenever the design engineer (or management) wishes to specify that a specific action (or a sequence of actions) be taken on a specific highway segment for whatever reasons.

Author Information

Majidzadeh, K
Resource International, Inc., Westerville, Ohio
Saraf, CL
Resource International, Inc., Westerville, Ohio
Kennedy, JC
Battelle, Columbus, Ohio
Price: $25.00
Contact Sales
Related
Reprints and Permissions
Reprints and copyright permissions can be requested through the
Copyright Clearance Center
Details
Developed by Committee: E17
Pages: 318–333
DOI: 10.1520/STP17810S
ISBN-EB: 978-0-8031-5175-8
ISBN-13: 978-0-8031-1421-0