Journal Published Online: 14 March 2019
Volume 47, Issue 6

Optimized Inventory Control on Construction Materials by Application of E-Technology Transfer along JIT

CODEN: JTEVAB

Abstract

Most of the construction projects in India experience ineffective inventory control because of the application of the conventional method. This conventional procurement management method is commonly practiced (more than 95 % of the time), which encourages improper utilization of resources in construction industries. Material procurement is a financially operated arena that requires technology transfer rather than common techniques. Construction stakeholders are generally unaware of E-Technology development. Recent E-Technology commerce networking and communication has been drastically improved and thus can be effectively utilized to produce uninterrupted supply chain management in construction procurement systems; additionally, this technological transfer system in construction industries can improve the profit margins and can avoid time overrun of construction projects.

Author Information

Harsha Vardhana, Balaji
Department Construction Technology and Management, Addis Ababa Science and Technology University (AASTU), Addis Ababa, Ethiopia
Venugopal, Pulidindi
Department of Technology Management, VIT University, Vellore, India
Pages: 7
Price: $25.00
Related
Reprints and Permissions
Reprints and copyright permissions can be requested through the
Copyright Clearance Center
Details
Stock #: JTE20180500
ISSN: 0090-3973
DOI: 10.1520/JTE20180500