Significance and Use

4.1 Use of HCT Data and Testing Objectives—The laboratory weathering test method (D5744) generates data that can be used to:

4.1.1 Determine whether a solid material will produce an acidic, alkaline, or neutral effluent;

4.1.2 Identify solutes in the effluent that represent dissolved weathering products formed during a specified period of time, and inform the user of their potential to produce environmental impacts at a mining or metallurgical processing site under proposed operating conditions;

4.1.3 Determine the mass of solute release; and

4.1.4 Determine the rate at which solutes are released (from the solids into the effluent) under the closely controlled conditions of the test for comparison to other materials.

4.1.5 These approaches are based on the existence of detailed mineralogical work and static tests that provide a basis for interpreting HCT results.

4.1.6 Detailed mineralogical work might lead a reviewer to suspect either acid neutralization potential (ANP) or acid generation potential (AGP) minerals have questionable availability, which would be a significant factor in interpreting HCT results and decisions concerning test duration.

4.2 Interpretation of data generated by the laboratory weathering procedure can be used to address the following objectives:

4.2.1 Determine the variation of drainage quality as a function of compositional variations (for example, iron sulfide and calcium plus magnesium carbonate contents) within individual mine rock lithologies;

4.2.2 Determine the amount of acid that can be neutralized by the sample while maintaining a drainage pH of 6.0 under the conditions of the test;

4.2.3 Estimate mine rock weathering rates to aid in predicting the environmental behavior of mine rock; and

4.2.4 Determine mine rock weathering rates to aid in experimental design of site-specific kinetic tests.

4.3 Interpretation Approaches—Guides A, B, and C are intended as examples of what to consider in developing an approach for determining how reasonable objectives for humidity cells might be structured, and some possible criteria for cooperative management of HCTs involving stakeholders.

4.3.1 It is also possible to use an approach to establish a decision point, rather than an end point, to the humidity cell test during the planning stage. Guides A, B, and C are examples of techniques and associated criteria comprising some approaches to help interpret data generated by humidity cell tests. Decision points can be established during the planning stage to allow stakeholders an opportunity to review the results and decide if additional weathering cycles are needed to meet the objectives of the testing.

4.3.2 Continuation of the HCT beyond the decision point may or may not provide important information regarding the acceleration or deceleration of oxidation and metal leaching in the material being tested.

4.3.3 More detailed leachate information from a longer HCT may be critical information for designing waste management or water treatment facilities as accounted for in an AMP, but an agreed-upon endpoint of test objectives would allow for a decision that advances mine planning and permitting.

4.3.4 The laboratory weathering procedure provides conditions conducive to oxidation of solid material constituents and enhances the transport of weathering reaction products contained in the resulting weekly effluent. This is accomplished by controlling the exposure of the solid material sample to such environmental parameters as reaction environment temperature and application rate of water and oxygen.

4.3.5 Because efficient removal of reaction products is vital to track mineral dissolution rates during the procedure, laboratory leach volumes are large per unit mass of rock to promote the rinsing of weathering reaction products from the mine rock sample. Interpretation of laboratory kinetic tests by comparison with field tests has shown that more reaction products from mineral dissolution are consistently released per unit weight and unit time in laboratory weathering tests (2). For example, sulfate release rates observed in laboratory tests of metal mine rock have been reported to be three to eight times those for small-scale field test piles of Duluth complex rock (3), and from two to 20 times those for small-scale field test piles of Archean greenstone rock (4). A greater increase is anticipated when laboratory rates are compared with field rates measured from operational waste rock piles.

4.4 In some cases, it may be useful to establish criteria for a decision to end the weathering cycles for a particular cell based on HCT results but still continue to maintain the HCT test weathering cycles for a longer duration.

4.4.1 In other cases, it might be useful to have duplicate HCTs and use one as a basis for a decision point and subsequent destructive evaluation of reaction products.

4.4.1.1 The duplicate cell could be maintained to confirm the basis for the decision and be used to update the AMP and financial guarantee, if necessary.

4.4.2 This approach supports a decision concerning mine waste management and planning, including an AMP.

4.4.3 This approach does not necessarily resolve the need for accurate prediction of long-term metal leaching and drainage quality, but is recommended as a tool for making decisions on how to conduct testing with the objective of determining how ore and waste will be handled and monitored, and the potential level of risk involved in related decisions for specific sites and materials.

4.5 Continuing HCT weathering cycles for an extended period of time may also provide a higher level of certainty.

4.6 Depending on the site-specific resources at risk and behavior of waste materials, an extended HCT weathering cycle duration may be an important consideration for stakeholder groups to use in evaluating HCTs.

4.7 As a mine typically involves very large quantities of waste rock, which will be leached by at least some amount of incident precipitation for extended times, ongoing monitoring of waste facility performance, including any produced effluent or leachate, is almost always required as a condition of permit approval.

4.8 Performance monitoring of permitted facilities can be a critical element in the development of a humidity cell performance database, as well as support for the evolving HCT weathering cycle duration criteria and approach proposed here.

4.9 A humidity cell performance database could be developed in a standard format to allow comparison of laboratory weathering results with drainage from field waste facility performance, based on publicly available information.

4.9.1 A model approach with possible objectives and criteria are presented below as examples to help interpret HCT results.

4.10 Variations in specific approach requirements and criteria (% sulfur, sulfide sulfur, carbonate, pH, sulfate release, etc.) will depend on the site-specific objectives, deposit mineralogy, and characterization, including various static test results and management plans agreed upon by stakeholders.

4.10.1 Regardless of the site-specific stakeholder objectives, instability in metal release rates should strongly suggest continuation of weathering cycle testing.

4.10.2 Regardless of the decision process followed, the ultimate responsibility for the permitting decision lies with the permitting agency(s), and the ultimate environmental liability and operating responsibility lies with the mining company.

4.11 These approaches are suggested as a model to be used by the involved stakeholders for their determination of when it is appropriate to schedule and extend HCT weathering cycles and how to treat the residues.

4.12 The specific parameters (sulfur, CaCO3, SO4–2 release rates, metal release rates, etc.) involved will likely vary depending on site-specific factors, which could include the lithology, petrology and mineralogy, climate, regulatory approach, environmental risk for the units, and ore deposit type being evaluated.

4.13 The criteria selected for management of the duration of HCTs should rely on a combination of parameters, as any criteria based on a single parameter value like % sulfur will not be reliable (5).

4.14 The values in the approaches presented are chosen only as examples, and actual cell management criteria are intended to be reviewed and agreed upon by the stakeholders, on a site-specific basis.

4.15 The specific parameters and values selected might vary considerably depending on site-specific factors, which might include environmental risk. It is up to the stakeholders to modify and use this approach to develop objectives which meet the specific requirements at their site and to use their modifications to reach a consensus on test duration.

4.16 The following decision criteria (sulfide sulfur quantitative limit, sulfate release rates, pH, and steady state duration) must be developed on a site/project-specific basis based on considerations including site-specific lithology, mineralogy, trace metal characteristics, and potential environmental risks. The values given in the following guides are merely example criteria; it is up to the stakeholders to manage their own criteria.

Scope

1.1 This kinetic test guide covers interpretation and cooperative management of a standard laboratory weathering procedure, Test Method D5744. The guide suggests strategies for analysis and interpretation of data produced by Test Method D5744 on mining waste rock, metallurgical processing wastes, and ores.

1.1.1 Cooperative management of the testing involves agreement of stakeholders in defining the objectives of the testing, analytical requirements, planning the initial estimate of duration of the testing, and discussion of the results at decision points to determine if the testing period needs to be extended and the disposition of the residues.

1.2 The humidity cell test (HCT) enhances reaction product transport in the aqueous leach of a solid material sample of specified mass. Standard conditions allow comparison of the relative reactivity of materials during interpretation of results.

1.3 The HCT measures rates of weathering product mass release. Soluble weathering products are mobilized by a fixed-volume aqueous leach that is performed and collected weekly. Leachate samples are analyzed for pH, alkalinity/acidity, specific conductance, sulfates, and other selected analytes which may be regulated in the environmental drainage at a particular mining or metallurgical processing site.

1.4 This guide covers the interpretation of standard humidity cell tests conducted to obtain results for the following objectives:

Guide and Objective

Sections

     A – Confirmation of Static Testing Results

56

     B – Evaluation of Reactivity and Leachate Quality
            for Segregating Mine, Processing Waste, or
            Ore

78

     C – Evaluation of Quality of Neutralization
            Potential Available to React with Produced
            Acid

910

 

 

1.5 This guide is intended to facilitate use of Test Method D5744 to meet kinetic testing regulatory requirements for metallurgical processing products, mining waste rock, and ores sized to pass a 6.3-mm (0.25-in.) Tyler screen.

1.5.1 Interpretation of standard humidity cell test results has been found to be useful for segregation of ore and waste and design of proper stockpiling and disposal facilities.

1.6 Interlaboratory testing of the standard D5744 humidity cell has been confined to mine waste rock. Application of this guide to metallurgical processing waste (for example, mill process tailings) is not supported by interlaboratory test data. Method B of Test Method D5744, however, has been found useful for testing of metallurgical products, and this guide is also useful for interpretation of those results (1).2

1.7 This guide is intended to describe various procedures for interpreting the results from standard laboratory weathering of solid materials in accordance with Test Method D5744. It does not describe all types of sampling and analytical requirements that may be associated with its application, nor all procedures for interpretation of results.

1.8 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this guide.

1.8.1 Exception—The values given in parentheses are for information only.

1.9 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

1.10 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

Price:
Contact Sales
Related
Reprints and Permissions
Reprints and copyright permissions can be requested through the
Copyright Clearance Center
Details
Book of Standards Volume: 11.04
Developed by Subcommittee: D34.01.04
Pages: 8
DOI: 10.1520/D8187-18
ICS Code: 13.030.10; 19.040