You are being redirected because this document is part of your ASTM Compass® subscription.
    This document is part of your ASTM Compass® subscription.

    If you are an ASTM Compass Subscriber and this document is part of your subscription, you can access it for free at ASTM Compass
    STP1209

    The Transition from Sampling to SPC

    Published: 01 January 1994


      Format Pages Price  
    PDF (128K) 9 $25   ADD TO CART
    Complete Source PDF (2.9M) 186 $55   ADD TO CART

    Cite this document

    X Add email address send
    X
      .RIS For RefWorks, EndNote, ProCite, Reference Manager, Zoteo, and many others.   .DOCX For Microsoft Word


    Abstract

    Modern quality control practice emphasizes the importance of process control in the creation of a quality product. When the process is in control it is possible to characterize the product forthcoming from the process, for the particular characteristic controlled, at the point in the process at which the control is instituted. When the process is out of control, the relationship between product and process is lost. It is then necessary to rely on acceptance sampling procedures to characterize the process. By combining the power of process control with the assurance of acceptance sampling, the process experimentation necessary for continual improvement can be undertaken with minimal risk to the consumer. An approach has been developed to transition from a process lacking control and/or capability to a controlled process with a Cpk value 1.33 indicating that the process is operating at an average level four sigma from the specification (s).

    Keywords:

    ABC Plan, Acceptance Sampling, Process Control, Capability, Mixed Plan, Sampling


    Author Information:

    Schilling, EG
    Director and Professor, Center for Quality and Applied Statistics, Rochester Institute of Technology, Rochester, NY


    Committee/Subcommittee: E11.10

    DOI: 10.1520/STP13196S