You are being redirected because this document is part of your ASTM Compass® subscription.
    This document is part of your ASTM Compass® subscription.

    If you are an ASTM Compass Subscriber and this document is part of your subscription, you can access it for free at ASTM Compass
    STP1314

    Quality Control Procedures to Prevent Water Leakage Through Windows

    Published: 01 January 1998


      Format Pages Price  
    PDF (68K) 4 $25   ADD TO CART
    Complete Source PDF (6.4M) 313 $98   ADD TO CART

    Cite this document

    X Add email address send
    X
      .RIS For RefWorks, EndNote, ProCite, Reference Manager, Zoteo, and many others.   .DOCX For Microsoft Word


    Abstract

    Most water leakage problems through windows and doors are the result of installation errors. Even the best system designs cannot overcome poor installation techniques. Simple mistakes such as the omission of an internal seal can result in major water leakage that damages building interiors, upsets building occupants and often results in costly repairs.

    By establishing a quality control procedure that specifically addresses windows and doors, common installation mistakes can be prevented. This paper will present a series of steps to follow before and during the construction process to insure proper installation of windows and other glazing products.

    Keywords:

    windows, sliding glass doors, water leakage, window installation, field water test


    Author Information:

    Beers, PE
    President, Glazing Consultants, Inc., Palm Beach Gardens, FL

    Smith, WD
    Vice President, Glazing Consultants, Inc., Palm Beach Gardens, FL


    Committee/Subcommittee: E06.51

    DOI: 10.1520/STP12107S