You are being redirected because this document is part of your ASTM Compass® subscription.
    This document is part of your ASTM Compass® subscription.

    Volume 40, Issue 5 (September 2017)

    Consolidation and Dynamic Response of a Layered Mine Tailings Deposit in Centrifuge Tests

    (Received 22 June 2016; accepted 24 March 2017)

    Published Online: 2017

    CODEN: GTJODJ

      Format Pages Price  
    PDF (1.77 MB) 16 $25   ADD TO CART

    Cite this document

    X Add email address send
    X
      .RIS For RefWorks, EndNote, ProCite, Reference Manager, Zoteo, and many others.   .DOCX For Microsoft Word



    Abstract

    Tailings from a mining project located in a seismically active region were used to construct and test a layered deposit on the geotechnical centrifuge at the Center for Earthquake Engineering Simulation (CEES) at Rensselaer Polytechnic Institute (RPI). A set of six centrifuge tests was conducted to evaluate consolidation rate, settlement accumulation, shear strength evolution, and response to seismic loading. The material was liquid at disposal, so instrumentation of every layer proved to be a challenge. A total height of about 30 m of mine tailings was deposited in prototype scale (80 g). Brief consolidation of each layer took place at a lower centrifugal acceleration, thus enabling the material to gain some strength and facilitating instrumentation, while simultaneously modeling a few days between disposal of subsequent layers. Miniature pore pressure transducers were used to measure water pressure and settlement, bender elements for shear wave velocity, linear variable differential transformers (LVDTs) for displacement, and miniature accelerometers for dynamic loading. The complete deposit consolidated at 80 g for more than two years in prototype scale, but most settlement, excess pore pressure dissipation, and stiffness increase occurred within the first 0.5 years. A mild slope was excavated at the surface after consolidation and the deposit was then subjected to a moderately strong harmonic motion consisting of 50 cycles. Signs of liquefaction were detected in the pore pressure, acceleration and lateral displacement readings up to mid-depth, and the slope was somewhat flattened after dynamic loading.

    Author Information:

    Antonaki, Nonika
    Geotechnical and Tunneling Group, WSP USA, New York, NY

    Abdoun, Tarek
    Civil and Environmental Engineering, Rensselaer Polytechnic Institute, Troy, NY

    Sasanakul, Inthuorn
    Department of Civil and Environmental Engineering, University of South Carolina, Columbia, SC


    Stock #: GTJ20160143

    ISSN:0149-6115

    DOI: 10.1520/GTJ20160143

    Author
    Title Consolidation and Dynamic Response of a Layered Mine Tailings Deposit in Centrifuge Tests
    Symposium ,
    Committee D18