Active Standard: D7007 - 16
Developed by Subcommittee: D35.10 | Committee D35 | Contact Staff Manager
Keywords
construction quality assurance; electrical leak location method; geoelectric leak location; geomembrane; leak detection; leak location;;Rationale
It is time for the 5-year review of the standard and items require updating. Updates include the addition of certain reporting requirements that are necessary to ensure a thorough survey was completed. This information leads to understanding of the site before survey begins and after a survey has been completed. Additional considerations to be made for new materials available as well.
Back to TopDate Initiated:
03-02-2021
Technical Contact:
Matthew Kemnitz
Item:
020
Ballot:
D35 (21-01)
Status:
Negative Votes Need Resolution