Active Standard: E399 - 20a
Developed by Subcommittee: E08.07 | Committee E08 | Contact Staff Manager
Keywords
Rationale
Revise E399 Section 10.2.4 and Annex A8 to better reflect modern precracking methods. The reporting requirement in 10.2.4 and the precracking language in Annex A8 paras. A8.4.2 and A8.4.3 assumes a multi-stage load shedding procedure (constant load in each step) while precracking today is often done in one stage under K-control (Constant DK or Decreasing DK).
Back to TopDate Initiated:
01-06-2020
Technical Contact:
Gary Bray
Item:
003
Ballot:
E08 (20-04)
Status:
Ballot Item Approved as E399-2020A
and Pending Publication
Item:
004
Ballot:
E08 (20-04)
Status:
Ballot Item Approved as E399-2020A
and Pending Publication