ASTM WK70784

    Revision of F1743 - 17 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)

    (What is a Work Item?)

    Active Standard: F1743 - 17

    Developed by Subcommittee: F17.67 | Committee F17 | Contact Staff Manager



    WK70784


    Keywords

    cured-in-place pipe; installation—underground; plastic pipe—thermoset; rehabilitation; thermosetting resin pipe ;;

    Rationale

    Addition of Ultra Violet (UV) light as an alternate curing system

    Citing ASTM Standards
    Back to Top
    Work Item Status

    Date Initiated:
    11-22-2019

    Technical Contact:
    Abu Abraham

    Status:
    Draft Under Development