ASTM WK70598

    Revision of F710 - 19 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring

    (What is a Work Item?)

    Active Standard: F710 - 19e1

    Developed by Subcommittee: F06.40 | Committee F06 | Contact Staff Manager



    WK70598


    Keywords

    adhesive removers; cement; concrete floors; installation; moisture; moisture vapor emissions; pH testing; preparation; resilient flooring; rubber; slabs;;

    Rationale

    The Task Group will collaborate to determine if 5.2 pH Testing needs to be revised at this time. 5. Testing Procedures: 5.2 pH TestingConcrete floors shall be tested for pH prior to the installation of resilient flooring. Levels of pH shall not exceed the written recommendations of the resilient flooring manufacturer or the adhesive manufacturer, or both.

    Citing ASTM Standards
    Back to Top
    Work Item Status

    Date Initiated:
    11-14-2019

    Technical Contact:
    Lee Eliseian

    Item:
    002

    Ballot:
    F06 (20-05)

    Status:
    Negative Votes Need Resolution

    Item:
    003

    Ballot:
    F06 (20-05)

    Status:
    Negative Votes Need Resolution