ASTM WK56937

    Revision of F2019 - 11 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP)

    (What is a Work Item?)

    Active Standard: F2019 - 11

    Developed by Subcommittee: F17.67 | Committee F17 | Contact Staff Manager



    WK56937


    Keywords

    cured-in-place pipe (CIPP); glass reinforced plastic (GRP); rehabilitation; steam cured; UV-cured; UV-light-cured: Conduits; Curing (in pipeline/conduit rehabilitation); Glass-fiber-reinforced (GRP) plastics; Installation--plastic pipe materials/applications; Pulled-in-place installation (of pipelines); Rehabilitation--sewerlines;

    Rationale

    F2019 is being updated to reflect the current state of the CIPP systems represented by the users of this standard.

    Citing ASTM Standards
    Back to Top
    Work Item Status

    Date Initiated:
    12-12-2016

    Technical Contact:
    Norman Kampbell

    Item:
    044

    Ballot:
    F17 (18-03)

    Status:
    Negative Votes Need Resolution