ASTM WK56937

    Revision of F2019 - 11 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP)

    (What is a Work Item?)

    Active Standard: F2019 - 11

    Developed by Subcommittee: F17.67 | Committee F17 | Contact Staff Manager



    WK56937

    1. Rationale

    F2019 is being updated to reflect the current state of the CIPP systems represented by the users of this standard.


    Keywords

    cured-in-place pipe (CIPP); glass reinforced plastic (GRP); rehabilitation; steam cured; UV-cured; UV-light-cured: Conduits; Curing (in pipeline/conduit rehabilitation); Glass-fiber-reinforced (GRP) plastics; Installation--plastic pipe materials/applications; Pulled-in-place installation (of pipelines); Rehabilitation--sewerlines;
    Citing ASTM Standards
    Back to Top
    Work Item Status

    Date Initiated:
    12-12-2016

    Technical Contact:
    Norman Kampbell

    Item:
    028

    Ballot:
    F17 (17-03)

    Status:
    Negative Votes Need Resolution