Standard Historical Last Updated: Aug 16, 2017 Track Document
ASTM D6462-99

Standard Practice for Silt Fence Installation

Standard Practice for Silt Fence Installation D6462-99 ASTM|D6462-99|en-US Standard Practice for Silt Fence Installation Standard new BOS Vol. 04.09 Committee D18
$ 66.00 In stock

Scope

1.1 This practice covers common installation requirements for temporary silt fence applications. This practice is based on AASHTO M288.

1.2 This practice is applicable to the use of silt fence as a vertical permeable interceptor designed to remove suspended soil from overland, nonconcentrated water flow. The function of a temporary silt fence is to trap and allow settlement of soil particles from sediment laden water. The purpose is to greatly limit the transport of eroded soil from the a construction site by water runoff.

1.3 The practices presented herein are intended to ensure good workmanship and quality and are not necessarily adequate for all purposes in view of the wide variety of possible sediments and performance objectives.

1.4 The values stated in SI units are to be regarded as the standard. The values in inch-pound units are provided for information only.

1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Price:
Contact Sales
Related
Reprints and Permissions
Reprints and copyright permissions can be requested through the
Copyright Clearance Center
Details
Book of Standards Volume: 04.09
Developed by Subcommittee: D18.25
Pages: 3
DOI: 10.1520/D6462-99
ICS Code: 59.080.70