| Meeting | Day | Start - Stop Times | |
| E06 Introduction to ASTM?s Built Environment Advisory Committee (BEAC) (R. C. Mathis) |
Monday |
05:00PM - 06:00PM | |
| E06 Performance of Buildings-Main |
Wednesday |
10:00AM - 12:00PM | |
| E061100 .01 Revisions to E72; E06.11.03 Revisions to E2126; E06.11.05 New Axial Compression Standard; E06.11.06 New Wall Transverse Standard; E06.11.16 Revisions to E455 |
Tuesday |
08:00AM - 12:00PM | |
| E061100 .18 New Standard Ceiling Seismic |
Tuesday |
01:00PM - 02:30PM | |
| E061100 Horizontal and Vertical Structures/Structural Performance of Completed Structures |
Tuesday |
03:00PM - 04:00PM | |
| E061300 TG .04/.05/.06/.13 Anchor in Concrete and Masonry Elements |
Monday |
09:00AM - 12:00PM | |
| E061300 Structural Performance of Connections in Buildings |
Monday |
01:00PM - 03:00PM | |
| E062100 .08 Plastic Water Vapor Retarders |
Monday |
08:30AM - 10:00AM | |
| E062100 .12 A/B Environmental Exposure/Aging of Fire Stop Materials |
Monday |
09:00AM - 11:00AM | |
| E062100 .16 Inspection Procedures (E2174,E2393) |
Monday |
11:00AM - 02:30PM | |
| E062100 .20 Insulated Concrete Forms (E2634) |
Monday |
01:00PM - 02:30PM | |
| E062100 .17 Credentials for Inspections |
Monday |
02:30PM - 05:00PM | |
| E062100 .20B Guide for Installation of ICF Systems |
Monday |
02:30PM - 04:00PM | |
| E062100 .21A Fire Stop Systems Guide |
Tuesday |
08:00AM - 09:00PM | |
| E062100 .07 Floor Flatness |
Tuesday |
09:00AM - 10:00AM | |
| E062100 .21B Fire Stop System Movement |
Tuesday |
09:00AM - 11:00AM | |
| E062100 .01 Sprayed on Fire Protection Materials (SFPM) |
Tuesday |
10:00AM - 12:00PM | |
| E062100 .16 Inspection Procedures (E2174,E2393) |
Tuesday |
11:00AM - 12:00PM | |
| E062100 Serviceability |
Tuesday |
02:00PM - 04:00PM | |
| E062200 .05 Sealed Insulated Glass |
Monday |
08:00AM - 12:00PM | |
| E062200 .09 Durability of Air & Weather Barriers |
Monday |
01:00PM - 02:00PM | |
| E062200 .07 Chromogenic Glazings |
Monday |
01:00PM - 04:00PM | |
| E062200 Durability Performance |
Monday |
04:00PM - 05:30PM | |
| E062300 Lead Hazards Associated with Buildings |
NOT MEETING |
| E062400 .04 Stone Consolidants |
NOT MEETING |
| E062400 .02 Tuckpointing |
NOT MEETING |
| E062400 Building Preservation and Rehabilitation Technology |
NOT MEETING |
| E062500 Whole Buildings and Facilities |
NOT MEETING |
| E062500 .83 Probable Loss from Windstorm |
NOT MEETING |
| E062500 .02 Process for Setting Requirements and Rating Serviceability |
NOT MEETING |
| E062500 .37 Flood Damage Resistance Rating of Materials and Assemblies |
Monday |
01:00PM - 05:00PM | |
| E064100 .03 Radon |
NOT MEETING |
| E064100 .04 Moisture Control and Modeling |
Monday |
02:00PM - 03:00PM | |
| E064100 .07 Moisture Modeling |
Monday |
03:00PM - 04:00PM | |
| E064100 .01 Air Leakage and Tracer Gas Testing |
Tuesday |
08:00AM - 09:00AM | |
| E064100 .02 Pressurization Methods |
Tuesday |
09:00AM - 10:00AM | |
| E064100 .05 Air Barrier Systems |
Tuesday |
10:00AM - 02:30PM | |
| E064100 Air Leakage and Ventilation Performance |
Tuesday |
02:30PM - 04:00PM | |
| E065100 .06 Fenestration Acoustics |
Monday |
07:30AM - 08:00AM | |
| E065100 .21 on Security Glazing Systems |
Monday |
09:00AM - 10:00AM | |
| E065100 .11 Installation |
Monday |
10:00AM - 12:00PM | |
| E065100 .01 Structural Loads |
Monday |
01:00PM - 02:00PM | |
| E065100 .04 Air Leakage |
Monday |
02:00PM - 04:30PM | |
| E065100 .10 Forced Entry Resistance |
Tuesday |
08:00AM - 09:45AM | |
| E065100 .02 Water Resistance |
Tuesday |
10:00AM - 12:00PM | |
| E065100 .13 Glass Strength |
Tuesday |
01:00PM - 03:30PM | |
| E065100 .08 Thermal Peformance Joint with C16.30.4.5 (C1199) |
Tuesday |
02:00PM - 05:00PM | |
| E065100 .17 Impact Resistance |
Tuesday |
03:30PM - 06:00PM | |
| E065100 Performance of Windows, Doors, Skylights and Curtain Walls |
Wednesday |
08:00AM - 10:00AM | |
| E065300 Materials and Processes for Durable Rigidwall Relocatable Structures |
NOT MEETING |
| E065400 .05 Masonry Heaters |
NOT MEETING |
| E065400 .09 Particulate Emissions Measurement |
NOT MEETING |
| E065400 Solid Fuel Burning Appliances (Tentative) |
NOT MEETING |
| E065400 .01 Pellet Stove Emissions WG2 |
NOT MEETING |
| E065400 .04 Pellet Burning Appliances (E1509) (Tentative) |
NOT MEETING |
| E065400 .06 Fireplace Emissions (E2558) |
NOT MEETING |
| E065400 .08 Outdoor Furnace Performance (E2618) (Tentative) |
NOT MEETING |
| E065400 .01 Woodstove Emissions WG1 |
NOT MEETING |
| E065400 .07 Masonry Fireplaces |
NOT MEETING |
| E065500 ASTM/NIBS BEC Certification Technical Advisory Comm |
Monday |
10:00AM - 12:00PM | |
| E065500 .09 Building Enclosure Commissioning (BEXc) Practice |
Monday |
01:00PM - 02:00PM | |
| E065500 .10 BECx Certification |
Monday |
02:00PM - 04:00PM | |
| E065500 .07 Weather Resistant Barriers |
Monday |
04:00PM - 05:00PM | |
| E065500 .11 BECx Guide |
Monday |
04:00PM - 05:00PM | |
| E065500 .04 Weather Resistance of Frame Buildings |
Tuesday |
08:00AM - 10:00AM | |
| E065500 .05 Facade Inspection |
Tuesday |
10:00AM - 11:00AM | |
| E065500 .03 Design |
Tuesday |
11:00AM - 12:00PM | |
| E065500 .15 Water Penetration |
Tuesday |
01:00PM - 03:00PM | |
| E065500 .02 Mock-Up Testing and Evaluation |
Tuesday |
03:00PM - 04:00PM | |
| E065500 Exterior Building Wall Systems |
Tuesday |
04:00PM - 05:00PM | |
| E065600 .04 Glass Floor and Stairs |
NOT MEETING |
| E065600 .02 Metal Railings (E894, E935, E985) |
Tuesday |
09:00AM - 10:00AM | |
| E065600 .03 Glass Railing (E2353,E2358) |
Tuesday |
10:00AM - 11:00AM | |
| E065600 Performance of Railing Systems and Rails for Buildings |
Tuesday |
11:00AM - 01:00PM | |
| E065700 Performance of Metal Roof Systems |
NOT MEETING |
| E065800 Exterior Insulation and Finish Systems (EIFS) |
Tuesday |
08:30AM - 12:00PM | |
| E067500 Building Safety in the Construction Life Cycle |
Tuesday |
03:00PM - 05:00PM | |
| E067700 High Rise Building External Evacuation Devices |
NOT MEETING |
| E068100 Opening Meeting Building Economics |
Monday |
02:00PM - 02:30PM | |
| E068100 .01 Terminology |
Monday |
02:30PM - 03:00PM | |
| E068100 .03 Computational Aids |
Monday |
03:30PM - 04:00PM | |
| E068100 .02 Techniques |
Monday |
04:00PM - 05:00PM | |
| E068100 Strategic Planning |
Tuesday |
08:00AM - 10:00AM | |
| E068100 UNIFORMAT II Session 1 |
Tuesday |
10:00AM - 12:00PM | |
| E068100 UNIFORMAT II Session 2 |
Tuesday |
01:00PM - 05:00PM | |
| E068100 Building Economics |
Wednesday |
08:00AM - 10:00AM | |
| E069000 Executive I |
Monday |
07:00AM - 08:45AM | |
| E069000 Executive II (Continue if needed) |
Wednesday |
08:00AM - 08:30AM | |
| E069100 Long Range Planning |
Sunday |
05:00PM - 06:00PM | |
| E069200 ISO/TC 59/Building Construction- US TAG |
NOT MEETING |
| E069400 Terminology and Editorial |
Monday |
01:00PM - 02:00PM | |