ASTM WK41891

    New Practice for Standard Practice for the Full-Length Monitoring of the Interface Temperature of a Cured in Place Pipe Lining Process

    (What is a Work Item?)

    Developed by Subcommittee: F36.10 | Committee F36 | Contact Staff Manager



    WK41891

    1. Scope

    The proposed standard will address the equipment components required, the equipments deployment into the host pipe to be lined, and the operating procedure to be followed in order to capture the temperature of the liner during processing to confirm that the heating and cooling of the CIPP is within the system manufacturers stated processing parameters.

    Much needed among the tools needed to do more with less in underground aging pipes carrying sewage and water


    Keywords

    cipp, trenchless, curing, temperature,

    The title and scope are in draft form and are under development within this ASTM Committee.

    Citing ASTM Standards
    Back to Top
    Work Item Status

    Date Initiated:
    04-26-2013

    Technical Contact:
    Norman Kampbell

    Item:
    001

    Ballot:
    F36.10 (13-02)

    Status:
    Negative Votes Need Resolution