You are being redirected because this document is part of your ASTM Compass® subscription.
    This document is part of your ASTM Compass® subscription.


    “Cured-In-Place Pipe: An end User Assessment”

    Published: Jan 1990

      Format Pages Price  
    PDF () 7 $25   ADD TO CART
    Complete Source PDF (6.6M) 7 $60   ADD TO CART


    Trenchless technology is rapidly entering the North American marketplace as demand creates an increasing need for cost-effective pipe renovation. One of these technologies is Cured-In-Place Pipe (CIPP). Generally, these lining processes consist of a resin impregnated flexible tube, inserted into the existing pipeline by winch, air pressure or hydrostatic head, and cured to final structural properties through the application of heat. CIPP technology will be reviewed and its position in the marketplace discussed. Factors affecting selection of this type of process will be assessed. Performance criteria and installation requirements will also be discussed.


    cured-in-place pipe, liner, inversion, sewer reconstruction

    Author Information:

    Hannan, Philip M.
    Maintenance Reconstruction Division Head, Washington Suburban Sanitary Commission, Hyattsville, MD

    Committee/Subcommittee: D20.10

    DOI: 10.1520/STP42129S

    CrossRef ASTM International is a member of CrossRef.