SEDL / STP / STP1314-EB / STP12107S



Quality Control Procedures to Prevent Water Leakage Through Windows

Beers, PE
President, Glazing Consultants, Inc., Palm Beach Gardens, FL

Smith, WD
Vice President, Glazing Consultants, Inc., Palm Beach Gardens, FL


Pages: 4    Published: Jan 1998


Download this paper for $25 PDF (68K)          View License Agreement
Abstract

Most water leakage problems through windows and doors are the result of installation errors. Even the best system designs cannot overcome poor installation techniques. Simple mistakes such as the omission of an internal seal can result in major water leakage that damages building interiors, upsets building occupants and often results in costly repairs.

By establishing a quality control procedure that specifically addresses windows and doors, common installation mistakes can be prevented. This paper will present a series of steps to follow before and during the construction process to insure proper installation of windows and other glazing products.


Keywords:
windows, sliding glass doors, water leakage, window installation, field water test

Paper ID: STP12107S
Committee/Subcommittee: E06.51
DOI: 10.1520/STP12107S
CrossRef ASTM International is a member of CrossRef.