|
Failure to Meet Strength Requirements Pages: 2 Published: Jan 2005
Download this chapter for $25 PDF (56K)
View License Agreement Source: MNL49-EB Abstract S1 In the event that concrete tested in accordance with the requirements of Section 17 fails to meet the strength requirements of this specification, the manufacturer of the readymixed concrete and the purchaser shall confer to determine whether agreement can be reached as to what adjustment, if any, shall be made. S2 If an agreement on a mutually satisfactory adjustment cannot be reached by the manufacturer and the purchaser, a decision shall be made by a panel of three qualified engineers, one of whom shall be designated by the purchaser, one by the manufacturer, and the third chosen by these two members of the panel. S3 The question of responsibility for the cost of such arbitration shall be determined by the panel. S4 Its decision shall be binding, except as modified by a court decision. Paper ID: MNL10604M Committee/Subcommittee: C09.40 DOI: 10.1520/MNL10604M ASTM International is a member of CrossRef.ISBN10: 0-8031-3363-4 ISBN13: 978-0-8031-3363-1 | ||