SEDL / Journals / Geotechnical Testing Journal (GTJ) / Citation Page


Volume 16, Issue 1 (March 1993)

ISSN: 1945-7545
Page Count: 9


Rockfill Placement and Compaction Guidelines

Breitenbach, AJ
Project manager, Denver office of Welsh Engineering Science & Technology, Inc. (WESTEC), Englewood,CO

Abstract

The purpose of this article is to establish general guidelines for rockfill placement and compaction procedures. The guidelines are based on experience gained from the design and construction of several large rockfill tailing dams in the western United States. Valuable rockfill information was obtained from construction test fills using test procedures similar to those developed by the Corps of Engineers in the 1960s and modified for modern-day compaction equipment. The rockfill guidelines establish basic procedures that can be readily adapted to site-specific conditions.



Keywords:
rockfills, dams, compaction, test fill, lift thickness, roller type, roller passes, placement

Paper ID: GTJ10270J
DOI: 10.1520/GTJ10270J
ASTM International is a member of CrossRef.

Author Title Rockfill Placement and Compaction Guidelines Symposium , 0000-00-00 Committee D18