Standards

ASTM WK41046

(What is a Work Item? / How to Input to a Work Item)

Work Item: ASTM WK41046 - Revision of E1368 - 11 Standard Practice for Visual Inspection of Asbestos Abatement Projects


Active Standard: E1368 - 11

Developed by Subcommittee: D22.07 | Committee D22 Home | Contact Staff Manager



1. Rationale

Revise encapsulation standards in referenced documents and revise related text. Add D7521 asbestos-in-soil method to referenced documents and add related paragraph to 9.1 Crawl spaces.


Keywords

abatement; asbestos; cleanup; operations and maintenance; procedures; removal; responsibilities; visual inspection: Abatement activities/projects; Asbestos; Asbestos fiber; Attic insulation; Building materials/applications; Crawl spaces; Decontamination; Encapsulants/encapsulation; Glove bag operations; Health hazards; Inspection; Project work performance; Removal of asbestos; Visual examination--building materials;

Citing ASTM Standards

[Back to Top]




Work Item Status:
Date Initiated:02-21-2013
Technical Contact: Andrew Oberta

Item: 001
Ballot: D22.07 (13-02)
Status: Item Going To Next Ballot Level

Standards Tracker

Standards Subscriptions