1. Rationale
Revision for re-approval. To review/revise the safety precautions and operation of the incinerators.
Keywords
incinerators; shipboard wastes; ships; Cargo residue/waste; Design--ship construction; Garbage; Incineration/incinerators; Maintenance waste; Operational conditions/objectives/principals--shipboard; Plastic shipping materials/applications--specifications; Performance--marine (shipboard) materials/applications; Plastic waste materials; Shipbuilding materials (general)--specifications; Shipbuilding steel materials--specifications; Waste materials/processing--shipboard;
Citing ASTM Standards
[Back to Top]