Standards

ASTM WK40268

(What is a Work Item? / How to Input to a Work Item)

Work Item: ASTM WK40268 - Revision of C12 - 09 Standard Practice for Installing Vitrified Clay Pipe Lines


Active Standard: C12 - 13

Developed by Subcommittee: C04.20 | Committee C04 Home | Contact Staff Manager



1. Rationale

New section 6.6.3 provides specific flowability requirements for the CLSM mix


Keywords

backfilling; bedding; clay pipe; compaction; construction; design; excavation; installation; load factors; perforated pipe; pipe; sewers; trench foundation; trenching; vitrified; Vitrified clay pipe/fittings; Backfill; Bedding; Clay pipe/piping systems; Compaction control; Construction; Design--piping systems; Excavation site; Leachate drainage; Trenches; Underground installation;

Citing ASTM Standards

[Back to Top]




Work Item Status:
Date Initiated:01-09-2013
Technical Contact: Mark Bruce

Item: 004
Ballot: C04 (13-01)
Status: Ballot Item Approved as C12-2013 and Pending Publication

Standards Tracker

Standards Subscriptions