1. Rationale
In resolving the comments and negatives, along with adding D18 SPM changes, the changes were greater than editorial
Keywords
drilling; environmental site characterization; exploration; feasibility studies; field investigations; geological investigations; groundwater; hydrologic investigations; reconnaissance surveys; sampling; site characterization; site investigations; soil surveys; subsurface investigations: Cross-contamination; Drilling (in soil/rock); Environmental site assessment (ESA); Field investigations; Geological investigations; Ground water; Hydrogeologic models/investigations; Reconnaissance surveys; Rock drilling/coring/investigation; Rock sampling; Site identification/investigation/selection; Soil; Soil sampling; Subsurface investigation--soil/rock;
Citing ASTM Standards
[Back to Top]