1. Rationale
The rationale for changes to 6.3, 6.4 & 6.5 is to provide adequate bedding under the pipe in both the text and figures.
Keywords
backfilling; bedding; clay pipe; compaction; construction; design; excavation; installation; load factors; perforated pipe; pipe; sewers; trench foundation; trenching; vitrified; Vitrified clay pipe/fittings; Backfill; Bedding; Clay pipe/piping systems; Compaction control; Construction; Design--piping systems; Excavation site; Leachate drainage; Trenches; Underground installation;