ASTM WK37505

    Revision of C1710 - 11 Standard Guide for Installation of Flexible Closed Cell Preformed Insulation in Tube and Sheet Form

    (What is a Work Item?)

    Active Standard: C1710 - 11

    Developed by Subcommittee: C16.40 | Committee C16 | Contact Staff Manager


    1. Rationale

    In order to address comments obtained from the last ballot of C 1710 the following changes are recommended.We needed to remove 1)Section 10.2.4- Replace word prevent with reduce the rate of 2)Section 10.5 Pipe Hangers- Remove the words wooden dowels with load bearing materials.Also replace acronym PUR with PIR. 3) Section 10.6 Tanks and vessels-Replace Material safety data sheet (MSDS) with Safety Data Sheet(SDS) 4) Section 10.8 Layering insulation- Replace the word alternate with the word stagger 5) Fig 12 Insulated Pipe Hanger-Replace the word wood inset with load bearing insert and the word wood block with load baring block


    below ambient; closed cell insulation; condensation control; elastomeric instulation; installation guide; polyolefin insulation; polyethylene insulation: Closed cell; Flexible cellular materials; Insulation; Preformed thermal insulation;
    Citing ASTM Standards
    Back to Top
    Work Item Status

    Date Initiated:

    Technical Contact:
    Biju Thomas


    C16 (15-03)

    Ballot Item Approved as C1710-2015 and Pending Publication