Standards

ASTM WK33081

(What is a Work Item? / How to Input to a Work Item)

Work Item: ASTM WK33081 - Revision of F1743 - 08 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)


Active Standard: F1743 - 08

Developed by Subcommittee: F17.67 | Committee F17 Home | Contact Staff Manager



1. Rationale

Revise to include the ue of a cable type temperature monitoring system during the processing of the CIPP


Keywords

cured-in-place pipe; installationunderground; plastic pipethermoset; rehabilitation; thermosetting resin pipe; CIPP (cured-in-place thermosetting resin pipe); Conduits; Installation--plastic pipe materials/applications; Rehabilitation--sewerlines; Resin-impregnated tube; Thermosetting plastic pipe/tubing/fittings;

Citing ASTM Standards

[Back to Top]




Work Item Status:
Date Initiated:04-20-2011
Technical Contact: Norman Kampbell

Item: 022
Ballot: F17 (12-01)
Status: Negative Votes Need Resolution

Standards Tracker

Standards Subscriptions