    1. Scope

    1.1 This guide provides general guidelines for the management of an emergency operations center (EOC) before, during, and after activation for emergency or disaster support. 1.2 An EOC is where the coordination of response and recovery support is performed, but the EOC is also a physical location that generates its own demands. For the EOC team to perform effectively, the physical and organizational demands of the EOC as a facility shall be met. EOC management is distinct from the operational management of the incident. 1.3 This guide may also serve as a foundation for management of a smaller facility such as a department operations center (DOC) or larger facilities such as a regional operations center (ROC) or state operations center (SOC) with a broader area of responsibility and more extensive need to communicate and coordinate with others. 1.4 This guide applies to fixed facilities and does not specifically address portable or field-deployable EOCs at temporary locations, virtual EOCs using communications technology to link geographically separated participants, or EOC relocation under a continuity of operations plan (COOP). However, elements within this guide will apply to these situations. 1.5 This guide is the second in a series regarding the EOC. See Guide E2668 for the EOC development. 1.6 This guide includes some references and terminology specific to the United States of America but may be adapted for use elsewhere. 1.7 This standard does not address all of the safety concerns associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations before use.

    It is a companion standard guide to the Standard Guide for EOC Development that was just completed. This is the second of three standard guide on EOC development, management, and operation.


    Keywords

    emergency operations center; EOC; EOC facility management; EOC operational management; EOC Standard Operating Procedure (SOP); EOC planning; EOC planner; EOC coordinator; EOC coordination

    The title and scope are in draft form and are under development within this ASTM Committee.

    Citing ASTM Standards
    Back to Top
    Work Item Status

    Date Initiated:
    02-15-2011

    Technical Contact:
    Robert Stenner

    Item:
    003

    Ballot:
    E54 (13-04)

    Status:
    Ballot Item Approved as E2915-2013 and Pending Publication