1. Rationale
Rationale for Changes Related to Adhered Stone This section of Standard C1242 intends to add affirmatives with comments held until new section 9.7 became approved and added into C1242, and as resolved from Subcommittee Ballot C18.06 (10-02) responses discussed at San Antonio meeting. Changes to existing content: deleted, inserted, new. See minutes from past meeting for rationale for the refinements.
Keywords
anchor types; backup; consultants; design considerations; design process; exemplar; joints; materials of construction; stone anchors; stone installation; stone testing; water infiltration; Stone anchors; Stone design/erection considerations; Anchors/anchorage systems; Blind anchors; Building design and construction; Cladding anchors; Dimension stone; Exterior building stone; Face anchors; Installation--building materials/applications; Moisture protection (for anchors); Selection guides--materials ;
Citing ASTM Standards
[Back to Top]