Standards

ASTM WK26926

(What is a Work Item? / How to Input to a Work Item)

Work Item: ASTM WK26926 - Revision of C1232 - 09a Standard Terminology of Masonry


Active Standard: C1232 - 12

Developed by Subcommittee: C15.08 | Committee C15 Home | Contact Staff Manager



1. Rationale

A definition for permeable unit pavement system was approved on Main Ballots C 15(09-02) #21. A negative voter noted: In this definition and subsequent language the type of drainage medium beneath the pavers is assumed to be an open-graded gravel. This is short-sighted and does not allow for alternate media. Instead, we should keep the language performance based. That negative was withdrawn with the assurance that a new ballot item to include these concerns would be issued. This is second attenpt to revise the definition.


Keywords

Hollow masonry unit; Masonry assemblages; Masonry units; Solid masonry unit; Terminology--concrete/aggregates/masomry;

Citing ASTM Standards

[Back to Top]




Work Item Status:
Date Initiated:12-28-2009
Technical Contact: J Gregg Borchelt

Item: 033
Ballot: C15 (12-02)
Status: Approval On Hold

Standards Tracker

Standards Subscriptions