1. Rationale
1.Revises Section 8.2 to clarify that the month and year code mark requirement is a minimum requirement. It is permissible for a manufacturer to mark the product with a more detailed date code. 2.Revises Section 7.7.1 to assure that the test fixture is appropriate for the gate being tested and clarifies the identity and use of the board attached to the fixture. 3.Revises item revises the Push-out Test Procedure in Section 7.7.2.4(1) to clarify how the forces are applied to the gate.
Keywords
enclosure; expandable enclosures; expansion gates; gates; ICS Number Code 97.190 (Equipment for children)
Citing ASTM Standards
[Back to Top]