Standard Historical Last Updated: May 30, 2012 Track Document
ASTM E2252-04

Standard Practice for Selection of Lead Hazard Reduction Methods for Identified Risks in Residential Housing or Child Occupied Facilities

Standard Practice for Selection of Lead Hazard Reduction Methods for Identified Risks in Residential Housing or Child Occupied Facilities E2252-04 ASTM|E2252-04|en-US Standard Practice for Selection of Lead Hazard Reduction Methods for Identified Risks in Residential Housing or Child Occupied Facilities Standard new BOS Vol. 04.12 Committee E06
$ 75.00 In stock

Significance and Use

This practice outlines lead hazard reduction methods that have been shown to be effective in preventing lead poisoning in children.

This practice tabulates advantages, disadvantages, and relative costs of the reduction methods to assist professionals such as certified lead risk assessors, supervisors, or project designers in selecting appropriate cost-effective options for controlling lead hazards identified during a lead risk assessment. Different control methods may be equally effective in controlling a given lead hazard and, consequently, the selection of a specific control method may depend on the needs and economic constraints of the client or building owner.

This practice is intended to complement other lead hazard activities that are performed in accordance with regulations promulgated by authorities having jurisdiction. For example, in some jurisdictions, a lead hazard risk assessment, by regulation, consists of a visual assessment, a hazard assessment including environmental monitoring for lead, and selection of lead hazard reduction methods.

This practice is intended to assist homeowners, owners and occupants of rental property, lenders, insurers, and others who have interest in selecting options for controlling hazards associated with leaded paint, dust, or soil.

This practice complements Practice E 2115. Information and data gathered in accordance with Practice E 2115 and this practice are used in preparing a risk assessment report. Subsequent lead hazards are mitigated through implementation of controls selected in accordance with this present practice.

This practice addresses the most commonly used lead hazard reduction methods. It is left to users of this practice to identify the advantages, disadvantages, and relative costs associated with emerging control technologies for comparison with these characteristics of established lead hazard control methods.

This practice does not address specific historic preservation requirements. The interim control and abatement methods in this practice will work in any structure; however, historic preservation regulations promulgated by authorities having jurisdiction may impose specific interim control or abatement methods.

Scope

1.1 This practice describes the selection of lead hazard reduction methods for controlling lead hazard risks identified during risk assessments of residential dwellings and child occupied facilities.

1.2 The values stated in SI units are to be regarded as the standard.

1.3 This practice contains notes, which are explanatory and are not part of the mandatory requirements of this standard.

1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Price:
Contact Sales
Related
Reprints and Permissions
Reprints and copyright permissions can be requested through the
Copyright Clearance Center
Details
Book of Standards Volume: 04.12
Developed by Subcommittee: E06.23
Pages: 9
DOI: 10.1520/E2252-04
ICS Code: 91.120.01