Standard Historical Last Updated: Dec 31, 2010 Track Document
ASTM E1548-03

Standard Practice for Preparation of Aerospace Contamination Control Plans

Standard Practice for Preparation of Aerospace Contamination Control Plans E1548-03 ASTM|E1548-03|en-US Standard Practice for Preparation of Aerospace Contamination Control Plans Standard new BOS Vol. 15.03 Committee E21
$ 75.00 In stock

Abstract

This practice is intended to assist in the preparation of formal plans for contamination control, especially of aerospace critical surfaces. The extent of detail and level of cleanliness required can vary with the particular application and type of hardware being built, but all aspects of contamination control must be included in a final plan. Therefore, each of the following elements must be considered for inclusion in a contamination control plan (CCP): cleanliness requirements, implementation plans, environmental controls, personnel and operational controls.

Scope

1.1 This practice is intended to assist in the preparation of formal plans for contamination control, especially of aerospace critical surfaces. Requirements may be established at the systems level, either by the customer or the systems integrator, or at the subsystem level. Subsystem requirements may be imposed by the responsible subsystem supplier or they may be flowed down from the systems organization (4.7). The extent of detail and level of cleanliness required can vary with the particular application and type of hardware being built, but all aspects of contamination control must be included in a final plan. Therefore, each of the following elements must be considered for inclusion in a contamination control plan (CCP):

1.1.1 Cleanliness requirementsfor deliverable hardware addressing particulate, molecular, or biological contaminants or combination thereof. Specify contamination limits and any budget allocations.

1.1.2 Implementation plansto achieve, verify, and maintain the specified cleanliness requirements. Specify material and process controls, cleaning techniques, verification tests, protection and prevention plans, transportation controls, and corrective action for discrepancies.

1.1.3 Environmental controlsincluding clean facilities to be used, facility maintenance, and monitoring schedule.

1.1.4 Personnel and operational controlsincluding operating procedures, restrictions, training, motivation, and organizational responsibilities including the organization or individual for implementation and verification of the CCP.

Price:
Contact Sales
Related
Reprints and Permissions
Reprints and copyright permissions can be requested through the
Copyright Clearance Center
Details
Book of Standards Volume: 15.03
Developed by Subcommittee: E21.05
Pages: 5
DOI: 10.1520/E1548-03
ICS Code: 49.020